Pencil on a dimensioned engineering drawing

Method

Document management

Dozens of companies take part in a renewable project and produce thousands of documents, many of which remain necessary for the whole life of the asset. We design the document management system so that this information is reliable from development onwards and arrives complete at every change of phase and every due diligence.

Photo: Sven Mieke, Unsplash License

Most companies have a document management system, SharePoint or another tool, and it rarely needs replacing. What is usually missing is common rules, because documents are produced by the company, the contractors, the manufacturers and the authorities, and will be consulted for thirty years by teams that did not write them. The cost shows up at three moments, which are the review of the contractor's engineering, commissioning, and the due diligence of a sale or a refinancing.

Our view

  1. 01

    Coding is set before the first contract is awarded, so that every contractor delivers with it from the first document.

  2. 02

    Metadata before folders. Folders grow with each contractor, while metadata lets the whole portfolio be filtered on one criterion.

  3. 03

    Each document moves through statuses with an approval recorded at each change, following the ISO 19650 scheme, even on projects that do not follow the standard. The handover package to operations is built during construction.

What we deliver

We work on the tool the company already has. Whether to change it is the company's decision.

  • A diagnosis of the current system, covering where the documentation is, how many versions of critical documents are in circulation and how long it takes to find one.
  • The document management plan, with coding, statuses, metadata, approval workflows and retention.
  • Document requirements for contracts, with their review periods and formats.
  • Implementation on the company's tool and training for the team and the contractors.
  • Training for the team, and the indicators and meetings the company uses to follow the process, with our support if needed.

Agents and tailored tools

In large portfolios, artificial intelligence agents are particularly useful. They classify what enters the system, detect duplicates and superseded versions, check that the file for each stage gate is complete before the decision and answer the team's questions citing the document and the page. The rules of the archive and their approval remain with the company.

What it connects to

The document management system holds what every process produces and is the source of their evidence. The packs for each gate and each readiness checklist, the file for each handover and the data the agents work with all come from it, and the RACI matrix sets who approves each document. With the archive as the single source, each process takes what it needs from it and the PMO works connected, without documents being redone.

What the diagnostic checks in this area

  • Can the team find the current version of a drawing or a contract in minutes?
  • Do the contracts set out for each contractor the coding, formats and environment in which it must deliver its documentation?

See the free diagnostic

The other areas

  1. 00

    Governance and RACI

    We help the company set who decides, who carries out and who is accountable for each task in its projects, with a RACI matrix shared across the portfolio. It is the base on which the other processes rest.

    See the area
  2. 01

    Feasibility and gates

    A renewable project goes through several investment decisions before it is built, from the feasibility study that takes it out of prospecting to secured offtake. We help the company take all its projects through the same phases and the same gates, with written gate criteria and a capitalisation policy consistent with them.

    See the area
  3. 02

    Risk management

    We implement a risk register common to the whole portfolio, opened at feasibility, that gives each risk an owner and a plan and, where appropriate, a specific share of the contingency.

    See the area
  4. 03

    Planning

    We structure planning around a master plan per technology and country, from which each project's schedule is derived, and an update cycle designed to detect delays while they can still be recovered.

    See the area
  5. 04

    CAPEX control

    We organise CAPEX control around the final cost forecast, updated every month line by line and connected to the financial model, so that every deviation is read in terms of returns and answered with a quantified recovery plan.

    See the area
  6. 05

    Contracts and changes

    We put order into the contracting strategy, the interfaces between contractors and the control of changes and claims, so that every variation is valued before it is approved and no contractual deadline expires without anyone noticing.

    See the area
  7. 06

    Readiness

    We design the readiness lists for the three gates of a project, into development, construction and operations, so that each step is signed off by the person accountable for it and any gaps the project moves ahead with have an owner and a date.

    See the area
  8. 08

    Handover

    The three transfers in a renewable project, from development to construction, from construction to operations and from the project to asset management, tend to be the points at which most information is lost. We design each one as a formal acceptance, with a package defined from the start of the phase and minutes signed by both the party handing over and the party receiving.

    See the area
  9. 09

    Lessons learned

    We design the lessons learned process so that every significant lesson ends in a change to the company’s standards, such as a procedure, a contract template or a time or cost estimate, before the next project starts.

    See the area