- Gate 1 · Feasibility approved
- Gate 2
- Gate 3
- Investment decision
- Commissioning
Many companies already have their phases defined, though not always in writing or applied in the same way across teams and countries. We review what the company already does, change what needs changing and turn it into a common model that any new project can follow from day one.
Our view
- 01
The criteria for each gate are agreed before the project is studied. That way the committee decides in one session instead of debating the study for months.
- 02
On returns, delay weighs as much as price, because in development it tends to be the most likely deviation.
- 03
Capitalisation hangs on the same gates. When development and finance share the criterion, the balance sheet reflects the real maturity of the portfolio.
What we deliver
We put the model in place in six to eight weeks and test it on two or three real projects before rolling it out. It adapts to what the company needs and can sit alongside its own approval process.
- The phase and gate model, with the criteria for each gate.
- The gate 1 feasibility study, with its score and the recommendation to the committee.
- The capitalisation policy, drafted with finance.
- Templates for each gate pack and for the note to the committee.
- Training for the team, and the indicators and meetings the company uses to follow the process, with our support if needed.
Agents and tailored tools
At gate 1, an agent builds the feasibility study from a questionnaire in blocks, answered with yes or no or with data, and turns it into a rating. At the following gates it checks the documents each one requires and the maturity of the project, and prepares a report for management with its recommendation. The decision stays with the committee.
What it connects to
The feasibility study produces the first risk register, the CAPEX baseline and the master plan assumptions. Readiness checks each pack, the RACI sets who approves it and lessons learned correct the criteria. What is studied at the feasibility stage reaches the other processes without being recalculated, which is what we mean by a connected PMO.