Risk management

We implement a risk register common to the whole portfolio, opened at feasibility, that gives each risk an owner and a plan and, where appropriate, a specific share of the contingency.

Photo: Martijn Stoof, Pexels License

Almost every company has a risk register. It is usually opened at the start and not reviewed again until the risk has already become a problem, while the contingency is spent without knowing against what. In renewables the major deviations are rarely technological and come from permitting, grid access, the supply of main equipment or the solvency of contractors. We review the register the company already has and change it where necessary.

Our view

  1. 01

    The register is opened in the feasibility study, when the site, the layout or the contracting strategy can still change and each risk costs a fraction of what it would on site.

  2. 02

    Contingency is allocated risk by risk and released when the risk passes. A fixed percentage of the budget cannot be defended before a committee or a lender.

  3. 03

    Each risk carries the date from which it becomes a problem. That date ranks urgency better than severity, and a register that does not change between two reviews is not being managed.

What we deliver

We design the process and put it in place with the company's team on its live projects, on the tools it already uses.

  • A common register, with the same fields and the same probability and impact scale on every project.
  • The contingency method by risk, with its release rule.
  • The governance of the process, with owners, approval thresholds for contingency and the monthly review.
  • The monthly risk report for management, with the consolidated exposure of the portfolio.
  • Training for the team, and the indicators and meetings the company uses to follow the process, with our support if needed.

ExhibitRisk exposure, from feasibility to operation

G1G2G3G4Risk exposure →FeasibilityDevelopmentConstructionCommissioningOperationNo active managementWith risk management

Agents and tailored tools

Where there is enough data, and if the company wishes, we deploy an artificial intelligence agent that alerts each owner before their dates fall due, keeps the register up to date with what comes in from site reports and suggests the risks that recurred on similar projects. It also prepares a draft of the monthly risk report. The Project Manager reviews it and decides what is mitigated and what is covered.

What it connects to

The register is born in the feasibility study and takes its owners from the RACI matrix. Each quantified risk feeds the contingency in CAPEX control and the dates in the schedule, open critical risks are reviewed at every readiness checklist and those still live when construction ends pass to operation at handover. Those that materialise return to the portfolio as lessons learned. Each risk is recorded once, and cost, schedule and the phase gates take it from there. That is a connected PMO.

What the diagnostic checks in this area

  • Is every euro of contingency allocated to a specific risk, with an owner and a criterion for releasing it?
  • Does the risk register show real changes from one month to the next, and does it reach management with the contingency consumed?

See the free diagnostic

The other areas

  1. 00

    Governance and RACI

    We help the company set who decides, who carries out and who is accountable for each task in its projects, with a RACI matrix shared across the portfolio. It is the base on which the other processes rest.

    See the area
  2. 01

    Feasibility and gates

    A renewable project goes through several investment decisions before it is built, from the feasibility study that takes it out of prospecting to secured offtake. We help the company take all its projects through the same phases and the same gates, with written gate criteria and a capitalisation policy consistent with them.

    See the area
  3. 03

    Planning

    We structure planning around a master plan per technology and country, from which each project's schedule is derived, and an update cycle designed to detect delays while they can still be recovered.

    See the area
  4. 04

    CAPEX control

    We organise CAPEX control around the final cost forecast, updated every month line by line and connected to the financial model, so that every deviation is read in terms of returns and answered with a quantified recovery plan.

    See the area
  5. 05

    Contracts and changes

    We put order into the contracting strategy, the interfaces between contractors and the control of changes and claims, so that every variation is valued before it is approved and no contractual deadline expires without anyone noticing.

    See the area
  6. 06

    Readiness

    We design the readiness lists for the three gates of a project, into development, construction and operations, so that each step is signed off by the person accountable for it and any gaps the project moves ahead with have an owner and a date.

    See the area
  7. 07

    Document management

    Dozens of companies take part in a renewable project and produce thousands of documents, many of which remain necessary for the whole life of the asset. We design the document management system so that this information is reliable from development onwards and arrives complete at every change of phase and every due diligence.

    See the area
  8. 08

    Handover

    The three transfers in a renewable project, from development to construction, from construction to operations and from the project to asset management, tend to be the points at which most information is lost. We design each one as a formal acceptance, with a package defined from the start of the phase and minutes signed by both the party handing over and the party receiving.

    See the area
  9. 09

    Lessons learned

    We design the lessons learned process so that every significant lesson ends in a change to the company’s standards, such as a procedure, a contract template or a time or cost estimate, before the next project starts.

    See the area